In addition to an accepted and feasible concept for the H2020 application, the results were prepared in such a way that E.DIS could use them for our strategic orientation with regard to storage in the distribution network.
First, an overall concept is developed and then the individual work packages are designed together with experts from E.DIS.
A contribution to a H2020 project application has been developed.